CONURMA has drawn up for AENA different extending and adapting project designs that were grouped in the file DIN 606/2016, called “ATRP Y ATDOCV DE PROYECTOS Y OBRAS EN VARIOS AEROPUERTOS. FASE II. LOTE 3: ATRP Y ATDOCV DE PROYECTOS DE EDIFICACION EN VARIOS AEROPUERTOS”. It consists on:
- Actions in the passport check area – EU Regulation, Tenerife Sur Airport.
- Extension project in the east façade terminal building. Federico García Lorca – Granada – Jaén Airport.
- Adaptation of the terminal building, technical block and AFIS tower. Córdoba Airport.
- Basic and execution project “Extension of the remote boarding, ground floor. Bilbao Airport.
- Drafting the terminal signage renovation specifications – Bilbao Airport.