Concept Design, Construction Project and Site Supervision
The project involves the expansion of the existent Airbus' factory for A-350 aircraft's partsin Illescas (RATE 13). The project is developed in two phases. First, a laying foundations project and, second, a construction project, which increases the surface to introduce new production lines and storage area, keeping unity with the adjacent building. Location.