INDUSTRIAL UNIT FOR A330/340 LATERAL BOX IN PUERTO REAL

Year: 
2013 - 2014
Location: 
Puerto Real, Cádiz, Spainña
Client: 
AIRBUS OPERATIONS, Private Entity
Area: 
3.031 m²
Budget: 
15.655.571,00€
Services: 

Construction Project, Site Supervision and Health and Safety Supervision.

Description: 

This industrial unit is attached to an existing building. It covers an area of 2.890 sq.m on the ground floor and has a height of 17 m as well as a space for offices in a mezzanine of 141 sq.m. The building is made of supporting steel structures, located at a distance of 12,85 m from one another and a length of 25,85 m. The pillars are separated 3 m from the existing building. The building was finished with a façade made of sandwich panel and ply roofing system. Location.